7.0 Hobbs Drain Catchment: Opportunities/Actions
Water Quality/Quantity
Offer the suite of water quality improvement projects (including the new tile drainage control outlet management funding) provided by the Rideau Valley Rural Clean Water Program to landowners where opportunities exist to manage rural runoff to the Hobbs Drain and tributaries:
- Homeowners may be interested in projects to repair, replace or upgrade their well or septic system, or addressing erosion through buffer plantings and erosion control
- Farmers can take advantage of a wide range of projects, including livestock fencing, manure storage, tile drainage control structures, cover crops, and many more
Continue to coordinate environmental monitoring and reporting activities with the City of Ottawa
Use wetland restoration as a tool to improve surface water quality and help restore the hydrologic integrity of the Jock River and its tributaries, including Hobbs Drain
List, share and when possible, synthesize and use existing hydrological and geochemical datasets and assessment outcomes to facilitate the characterization of subwatershed and catchment hydrological functions. In addition, prepare guidance on best practices for the preparation of water budget assessments to better understand the hydrologic cycle requirements that occur at site specific scales; and share existing catchment and subwatershed scale water budget assessment outcomes
Flewellyn Special Study Area, Cumulative Effects Study has been initiated by the City of Ottawa to better understand the hydrology in the area and associated drainage concerns
Hobbs Drain flood risks are to be studied as part of ongoing efforts to prepare flood plain mapping for the Jock River subwatershed
Headwaters/Instream/Shorelines
Promote the Rideau Valley Shoreline Naturalization Program to landowners to increase existing 39 percent of natural shoreline cover
Educate landowners about the value of and best management practices used to maintain and enhance natural shorelines and headwater drainage features
Work with the City of Ottawa to consistently implement current land use planning and development policies for water quality and shoreline protection (i.e., adherence to a minimum 30 metre development setback from water) adjacent to the Jock River and other catchment watercourses, including the Hobbs Drain
Target shoreline restoration at sites identified in this report (shown as “Other riparian land cover” in Figure 25) and explore other restoration and enhancement opportunities along the Hobbs Drain and its tributaries
Land Cover
Promote the City of Ottawa’s Green Acres Reforestation Program to landowners to increase existing 30 percent of woodland cover
Encourage the City of Ottawa to strengthen natural heritage and water resources policies in official plans and zoning by-laws where shoreline, wetland, woodland cover and watercourse setbacks are determined to be at or below critical ecological thresholds. Information for this purpose is provided in the RVCA’s subwatershed and catchment reports
Explore ways and means to more effectively enforce and implement conditions of land-use planning and development approvals to achieve net environmental gains
Re-consider the RVCA’s approach to wetland regulation where there is an identified hydrologic imperative to do so (i.e., significant loss of historic wetland cover (see Figure 24) and/or seasonal, critically low baseflows in the Jock River and/or areas of seasonal flooding)